(Para ver la página en Español, por favor cambie las opciones de idioma en la parte superior del sitio web)
The Mexico Landfill Protocol addresses GHG emission reductions associated with installing a landfill gas collection and destruction system at landfill operations in Mexico.
Current Protocol Version(s) Available for Project Submittal | Adoption Date | Notes and Supporting Documents |
---|---|---|
Mexico Landfill Protocol Version 2.0 (English | Spanish) | October 5, 2022 | Errata and Clarifications to Mexico Landfill Protocol Version 2.0 (English | Spanish) (July 19, 2023)
Mexico Landfill Protocol V2.0 summary (English | Spanish) Mexico Landfill Protocol Summary of Changes V1.1 to 2.0 (English | Spanish) |
Project Listing Documents
The documents below are required during the project listing phase.
Document | Description | Required Phase | Privilege |
---|---|---|---|
Mexico Landfill Project Submittal Form | A proposal to undertake a landfill gas collection and destruction project in Mexico. | Project Submittal | Public |
Project Diagram | A project diagram is required during project submittal and must be updated after changes to the project system. | Project Submittal | Public |
Project Registration Documents
The documents and tools below are designed to help landfill project developers organize their project data and facilitate verification. Use of the templates provided is optional; however, the documents are required for verification.
Document | Description | Required Phase | Privilege |
---|---|---|---|
Landfill Project Data Report – coming soon | The purpose of this document is to assist project developers in identifying high areas of risk, highlight important aspects of the protocol, and facilitate verification. | Verification | Public |
Landfill Monitoring Report Template – coming soon | The purpose of this document is to assist landfill project developers in documenting conformance with the monitoring and Q/QC requirements. Monitoring reports that cover the first reporting period of a two-year verification period must be submitted no later than six months following the end of the relevant reporting period. See Section 7 of the protocol for more information. | Verification | Private |
Knowledge Hub
Please contact the Reserve with questions or comments.