U.S. Landfill Protocol

The U.S. Landfill Protocol addresses GHG emission reductions associated with installing a landfill gas collection and destruction system at landfill operations located in the United States.

The US Landfill Protocol Version 6.0 is labeled with the ICVCM CCP Logo. This indicates that the applicable methodology has been assessed and approved as being in adherence to the CCP Assessment Framework.

Current Protocol Version(s) Available for Project Submittal Adoption Date Notes and Supporting Documents
U.S. Landfill Protocol Version 6.0 June 8, 2022 Errata and Clarifications to U.S. Landfill Protocol Version 6.0 (April 13, 2023)

Summary of changes from Version 5.0 to Version 6.0

U.S. Landfill Protocol Version 6.0 Summary

Protocol development and previous versions

Project Listing Documents

The documents below are required during the project listing phase.

Document Description Required Phase Privilege
U.S. Landfill Project Submittal Form A proposal to undertake a landfill gas capture and destruction project within the U.S. Project Submittal Public
Project Diagram A project diagram is required during project submittal and must be updated after changes to the project system. Project Submittal Public
Pre-Existing Landfill System Diagram A pre-existing landfill system diagram is only required if there is a pre-existing, active landfill gas collection and destruction system at the project site. Project Submittal Public

Project Registration Documents

The documents and tools below are designed to help landfill project developers organize their project data and facilitate verification. Use of the templates provided is optional; however, the documents are required for verification.

Document Description Required Phase Privilege
Landfill Project Data Report The purpose of this document is to assist landfill project developers in identifying high areas of risk, highlight important aspects of the protocol, and facilitate verification. Verification Public
Landfill Monitoring Report Template The purpose of this document is to assist landfill project developers in documenting conformance with the monitoring and Q/QC requirements. Monitoring reports that cover the first reporting period of a two-year verification period must be submitted no later than six months following the end of the relevant reporting period. See Section 7 of the protocol for more information. Verification Private